2nd Citizen Advisory Committee Meeting
Tuesday, August 4, 2026 · 7:00 PM – 8:30 PM · Virtual
Welcome and updates
Slide 1 of 18
Slide 1 of 18: Building the Community Benefits Plan Together
Use the arrow keys, the buttons, or swipe on a phone.
About This Meeting
This meeting took place on Tuesday, August 4, 2026. The slides above are exactly what the room saw, and the notes to the right were added afterward.
Need translation, interpretation, or another accommodation for a future meeting? Email jsantiago@esa-solar.com or call 407-232-7440 ext. 251 and we will arrange it.
What We Heard, and What We Did
About 20 residents joined by Zoom, along with a member of the Charlton Planning Board, for a full-group discussion followed by two breakout groups. Full minutes are posted in the Document Library and the Engagement Log.
Residents asked how much real influence this process gives the public. We pointed to the reduction from 156 to 136 units as a direct result of earlier feedback, and confirmed this committee and the extra public meetings are voluntary, beyond what state rules require.
We acknowledged the late mailer for the July 8 meeting, took responsibility for it, and committed to mailing notice at least one month ahead of the next public meeting, through multiple channels.
Residents asked for private well testing and how groundwater and soil will be protected. We disclosed that parts of the parcel have groundwater close to the surface, described planned containment measures, and set a MassDEP meeting for the end of August on groundwater, well locations, stormwater, and erosion control, with a written report to follow.
On fire readiness, we confirmed the Emergency Action Plan is being built with Charlton Fire, with an independent reviewer the town selects and we pay for, and held the fire safety webinar on August 19.
Residents asked for long-term financial protections and a signed agreement rather than a plan alone. We explained that whether Community Benefits Plan items move into a signed agreement is a decision for the town and the project, and that permit conditions, agreement terms, and the decommissioning bond carry to any future owner.
We added the Town of Carver's PILOT agreement for a comparably sized battery project to the Document Library, alongside the Medway, Tewksbury, Revere, and Chelsea agreements already posted there.
We built one commitment card together for fire equipment and training, then split into breakout groups to build cards for other priorities using the same five questions.
We confirmed that every item in the draft Community Benefits Plan will state its funding source and enforcement method, with the draft published this fall for public comment.



