What We Know

Wetlands Avoidance

We designed the project to avoid direct impacts to wetlands. We placed the BESS area within the 15-acre leased portion of the 47.13-acre parcel to maintain appropriate buffers from delineated wetland resource areas. Qualified environmental scientists conducted a wetland delineation on the property. We expect the actual disturbance area to be 10 acres or less, though this will depend on final site engineering.

Stormwater Management

We will develop a comprehensive stormwater management plan in accordance with the Massachusetts Stormwater Standards. Key elements include:

  • Pre- and post-development runoff analysis: we will analyze runoff to ensure no net increase in stormwater discharge
  • Erosion and sediment control: we will apply strict controls during construction to protect downstream waterways
  • Low-impact development practices: we will use vegetated swales and permeable surfaces where feasible
  • Long-term maintenance: we will monitor the stormwater infrastructure on an ongoing basis

Existing Vegetation and Screening

The equipment area sits inside a larger wooded parcel, set back from Carpenter Hill Road. The existing trees and terrain between the equipment area and neighboring properties provide:

  • Visual screening from neighboring properties
  • Natural stormwater absorption
  • Distance that reduces sound levels

Habitat Considerations

We will evaluate the project site for the presence of state-listed rare species and their habitats. We are coordinating with the Natural Heritage and Endangered Species Program (NHESP) to comply with the Massachusetts Endangered Species Act.

What We're Still Studying

  • NHESP review results: NHESP is reviewing our filing, and we will publish the results when we receive them
  • Detailed stormwater engineering: we will include final engineering designs in our consolidated permit application
  • Construction-phase environmental monitoring plan: we will develop this plan in consultation with environmental regulators
  • Long-term habitat monitoring: we will evaluate whether the project requires post-construction monitoring commitments

What You Can Influence

  • Environmental priorities: tell us which environmental concerns matter most to you through Share Your Voice
  • Screening and plantings: share your ideas for visual screening and native plantings around the equipment area
  • Monitoring commitments: suggest what environmental monitoring we should include in the project's operating plan