Slides · 37 slides

Site Suitability Analysis: Preliminary draft

Preliminary draft v0.4, October 12, 2026

What this report found

Slide 1 of 37

Site Suitability Analysis · Preliminary draft v0.4

Site Suitability Analysis

980 CMR 15.10 · October 12, 2026

1 · Summary2 · What the rule requires3 · The site and the Facility Boundary4 · Anticipated scores5 · Each criterion, and what sits behind it6 · Beyond the six criteria: what the site screening found7 · How the criteria shaped the site and the design8 · What happens next9 · Sources, methods and terms

Follow along at carpenterhillpower.com/reports/site-suitability

Slide 1 of 37: Site Suitability Analysis

Use arrow keys (← / →), swipe on touchscreens, or click Present for full-screen projector view. Click any full-bleed picture to open it full screen. Press L or click Library to find any slide.

Turn on to drag the maps into position yourself.

About these slides

Every slide is derived from the report itself, so the slides and the written report can never say different things. Use the Present button to run them full screen. Add a slide number to the URL, like #12, to link straight to one.

Need a printable version? Open one slide per page and print it, or read the full document layout.